Production Management System

Plan orders, load lines and see hourly output, efficiency and quality on one screen.

Overview

Production managers need to know three things every hour: are we on target, where is the bottleneck, and how many pieces failed quality. Uparjon Production Management System answers them with live data from the floor, instead of paper reports that arrive the next morning. It covers the full flow from buyer order and planning, through cutting, sewing and finishing, to shipment, with efficiency and DHU (defects per hundred units) calculated automatically.

Production Management System

From order to shipment

The production flow in the system

1

Order & plan

Buyer order, style, colour/size breakdown, SMV and ship date. The planner loads lines by capacity.

2

Cutting

Cutting plan, lay records and bundle creation for sewing.

3

Sewing

Hourly output per line against target, with operator and machine data.

4

Finishing & ship

Quality checks, packing and shipment against the order.

Efficiency and quality, calculated for you

The system uses the standard industry formulas, so your numbers match what buyers and consultants expect:

Line efficiency (%) = (pieces produced × SMV) ÷ (number of operators × working minutes) × 100

Example: a line of 30 operators works 600 minutes and produces 1,200 pieces of a style with SMV 9. Efficiency = (1,200 × 9) ÷ (30 × 600) × 100 = 60%.

DHU = (number of defects found ÷ number of pieces checked) × 100

Example: 45 defects found in 900 checked pieces gives a DHU of 5.

Key features

Capacity planning

Load orders onto lines by SMV and capacity, and see conflicts with ship dates early.

Line management

Targets per hour, per line, per style, with manpower and machine allocation.

Hourly production board

Big-screen dashboards on the floor show target vs actual for every line.

Efficiency tracking

Line and operator efficiency calculated automatically from SMV.

Quality (DHU)

Inline and end-line quality checks with defect types and DHU per line.

WIP tracking

Work in progress between cutting, sewing and finishing at any time.

Wastage control

Fabric and trim consumption against the plan, with a cut-to-ship ratio.

Reports

Daily production, efficiency, quality and order status reports for management and buyers.

What changes on the floor

  • Problems seen within the hour, not next morning
  • Clear targets for every supervisor
  • Data-based decisions on overtime and line balancing
  • Accurate order status for merchandisers
  • Less fabric wastage
  • Automatic data capture with RFID production tracking

Industries We Serve

Configured for the way your industry works.

Garments (Knit & Woven)

Order, line and hourly production with SMV-based efficiency

Sweater Factories

Knitting, linking and finishing stages

Textile Mills

Spinning, weaving and dyeing production records

Footwear & Leather

Cutting, stitching and lasting operations

Food Processing

Batch production, yield and wastage

Plastic & Packaging

Machine-wise output and downtime

Frequently Asked Questions

About Production Management System

It is strongest for garments and textiles, where SMV, line efficiency and DHU are standard. The planning, output, WIP and wastage features also work for footwear, plastics, food and other batch manufacturing.

Supervisors can enter hourly output from a tablet or PC. For fully automatic data, connect our RFID production tracking system, which captures every bundle at each workstation.

Yes. You can share order status reports, or give merchandisers a dashboard with progress against ship date.

Yes. Line efficiency uses (output × SMV) ÷ (operators × working minutes) × 100, and quality uses DHU, the measures commonly used in the industry.

Yes. It is part of Uparjon ERP, and can also exchange data with other systems through an API.

Yes. The production screens work on tablets and phones, so supervisors can record hourly output, defects and downtime at the line without walking back to an office PC.

Get a Free Quotation for Production Management System

Tell us about your business. We reply within one working day with a demo and a clear price.

Request a Quotation